Plan Series 03
Series 03
Adjustments
Tweaking the bed sizes and begin phases.
In the second series, we refined the layout by plant sizes. Now we are adjusting bed sizes.
03a
Bed sizes
This section addresses bed sizes in particular. I'd like to get your reaction on these before doing further details about individual plants and construction details.
- The lawn area has been increased to the area shown in green. This includes the cart path and new lawn areas. They are sized and positioned relative to trees to minimize mowing difficulty.
- These areas in black indicate ground covers 4" to 6" high. This might include wild ginger, Asiatic jasmine, vinca minor, etc. Ginger would be the least maintenance. vinca or jasmine would survive more sun. These beds can be planted sparsely now and allowed to fill in over a few years. Also there are other plant possibilities.
.
03b
Environmental Requirements
Updated compliance from Georgia Power. Straight, concrete walkways. Smaller firepit area (16'dia). Cart path gives way to bigger lawn area.
.
.
03c1
Final Plant Selection
Plant choices, dry creek bed.
.
.
.
03c2
Refinement
Plant choice changes, fire pit adjustment, advice from GaPwr, Plant schedule.
Notice that the lawn is flanked by 'vinca minor' groundcover on both sides. I changed the wild ginger to liriope. Liriope is more tolerant of the sun. You may not have enough shade for ginger after the tree thinning.
The fire pit is completely defined per GaPwr requirements.
I've completed the plant schedule (spreadsheet). Notice the key column corresponds to the plan drawing by number. For instance #7=azalea.
.
03c3
Cart Path Redesign
Grill area gravel landing, cart path added back in with adjustments, guidance request from GaPwr.
The cart path is redsigned to no longer intrude into the side buffer. The grill / landing has been moved, resized and specified as gravel.
.
.
Comments
Post a Comment